Nigeria’s electricity megawatts increase by 1,811.3

Nigeria’s electricity megawatts increase by 1,811.3

- There is an increase of 1,811.3 megawatts (MW) in power generation in January 2019

- According to reports, the Transmission Company of Nigeria (TCN) transmitted 127,157.7mw as against 125,346.4mw in December 2018

- The statistics indicated that power generation increased by 1,811.3 mw between December 2018 and January 2019

The federal government recorded an increase of 1,811.3 megawatts (MW) in power generation in January 2019, as the Transmission Company of Nigeria (TCN) transmitted 127,157.7mw as against 125,346.4mw in December 2018.

The daily statistics of TCN operations obtained by the News Agency of Nigeria (NAN) from Nigerian Electricity System Operator (SO), a section of the TCN, indicated that 127,157.7mw was generated between Jan. 1 and Jan, 31, 2019.

READ ALSO: Breaking: PDP campaign DG defects to APC

This translates to an increase of 1,811.3 mw harvested from the ongoing Nigerian Independent Power Projects (NIPP) to the national grid as against 125,346.4mw generated between Dec. 1 and Dec. 31, 2018.

The statistics indicated that power generation increased by 1,811.3 mw between December 2018 and January 2019.

NAN reports that the daily power generated between Jan.1 and Jan.15, 2019 stood at: 3,874.6mw, 3,806mw, 3,729.3mw, 3,733.4mw, 3,764.2mw, 4,077.8mw, 4,060.3mw, 4,165.5mw, 4,055.8mw and 4,029.8mw respectively.

Others are: 4,442.6mw, 4,004mw, 4,151.7mw, 4,465.2mw and 4,281.5mw.

It also showed that daily power generated from Jan. 16 to Jan. 31, 2019 stood at: 4,290.2mw, 4,301.7mw, 4,352.9mw, 4,107.4mw, 3,683.6mw, 4,069.9mw, 4,006.2mw 4,372.2mw, 4,358.2mw and 4,033mw respectively.

Others are: 3,986.4mw, 4,140.2mw, 4,424.8mw, 4,240,4mw, 3,307mw, and 4,221.9mw.

The energy generated was transmitted to 11 distribution companies (Discos).

The TCN said the national peak demand forecast stood at 19,100.00mw, while the installed available capacity was 11,165.40mw.

PAY ATTENTION: Read the news on Nigeria’s #1 news app

The current transmission capacity and network operational capacity are 7,000mw and 5,500.00mw respectively.

NAN also reports that the peak generation ever attained in Nigeria is 5,222.3mw, while the maximum energy ever attained stands at 109,372.01mwh.

Meanwhile, Legit.ng had reported that Nigeria is on course to generating 30 megawatts of electricity from coal next year, the ministry of mines and steel development has announced.

The ministry made the announcement in a document released by the minister of state in the ministry, , given to newsmen in Abuja on Sunday, January 20.

NAIJ.com (naija.ng) -> Legit.ng: Same great journalism, upgraded for better service!

Nigerian Electricity Crisis Explained | Legit TV.

Source: Legit

Mailfire view pixel